The Materials
Planning module integrates with the Sovman Bill of Materials
and Works Order modules and the Sage Line 100 Stock Control,
Sales Order Processing and Purchase Order Processing modules.
Materials
Planning explodes inputs multi-level through the Sovman BOM
producing a time-phased requirements plan. Inputs to the MRP
run are taken from two sources:
- Any forward order
quantities for manufactured items from sales order processing.
- Any panned production
entered through the planning maintenance function within
materials planning.
Inputs are
exploded and netted against stock and on order to produce
the materials plan.
The plan
can be viewed on the screen with drill down windows displaying
the actual transaction details for any column, e.g. purchase
order details for on order.
The plan
may also be printed as a report with selections on product
group, item and depot.
Sage Line
100 purchase orders may be generated automatically from the
plan.
Features
- Materials Planning
uses a calendar identifying the manufacturing week and actual
week. The calendar may be specified for any number of years
ahead and is 2000 compliant.
- The plan may be projected
over a planning horizon in weeks.
- Sales forecasts may
be entered into the plan for any item. Materials Planning
will take the greater of the forecast or actual requirements
for any week when projecting the plan.
- The plan displays
the available stock, requirements, forward order, purchase
orders, planned inputs, work-in-progress and requisitions
for each week in the calendar over the planning horizon.
Pop-ups display transaction details for each category.
- Materials Planning
uses re-order levels, re-order quantities and top-up quantities
to recommend requisitions within the plan. For works order
items, these may be created as planned inputs dynamically
on the planning screen. These inputs are immediately exploded
and the effect can be viewed.
- The planning screen
is linked to the explosion and implosion chains within the
BOM so that the user can 'navigate' up and down the BOM
to view the effect of planning changes in real time.
- Requisitions for bought
out items may be converted automatically to standard Sage
Line 100 purchase orders. Items may be excluded from this
process.

|

|