The Sovman
Works Order module integrates with Sage Line 100 Stock Control,
Sales Order Processing, Purchase Ledger and Nominal Ledger
modules and the Sovman Bill of Materials, Materials Planning
and Capacity Planning modules.
Works orders
may be created by releasing from Sage Line 100 sales orders
or by creating directly within the works order module.
Sales orders
may be partially released and partially completed.
When a works
order is released, the requirement is exploded through the
Bill of Materials (BOM) and the stock of components/sub-assemblies
is allocated. The assembly quantity is recorded as planned.
Shortages
may be displayed or reported. Orders may subsequently be de-allocated.
When stock is received, this may be allocated manually or
automatically to clear shortages.
Once released,
the works order may be issued. The component/sub-assembly
stock is reduced and the assembly quantity transferred from
planned to work-in-progress.
Orders may
be tracked through a number of user-defined stages before
completion. Once completed, the assembly quantity is transferred
from work-in-progress to stock. Where the works order originates
from a sales order, the sales order is automatically released
once the works order is completed.
The Works
Order module includes a full sub-contractor facility. Sub-contract
orders may be raised on suppliers, accounting for work-in-progress
at sub-contractors, and invoices may be approved.
Features
- Serial or batch tracking
of items as per the Sage Line 100 Stock Control module is
available.
- The Works Order module
uses the Sage Line 100 multi-depot and location facility.
Stock is allocated for a depot and across locations. When
a shortage is cleared, the depot is identified and the location
of stock may be selected.
- Full shortage control.
Shortages may be viewed on screen and reported. When stock
is received, shortages may be cleared manually or automatically.
- Full order tracking
is available. Up to ten user-defined production stages may
be specified. Each stage is linked to a product group and
may be specified as optional or mandatory. Orders may be
issued and completed at the same time to speed up processing.
- A back flush function
will allow only completed product quantities to be input.
This will then 'back flush' to issue and complete all stages
through to raw materials.
- A full sub-contractor
function handles work in progress at suppliers. Material
is received at the original material cost plus the sub-contract
labour. Purchase invoices may then be approved and posted
to Sage Line 100 Ledgers automatically.
- Works order paperwork
is generated including comments/narrative.
- Effective dates for
both assemblies and components are checked when exploding
through the BOM.
- Partial quantities
may be processed. Sales orders may be released into the
works order system as partials. Works orders may be partially
completed, the balance remaining outstanding or scrapped.
Over completions are also allowed.
- A works order may
be exploded multi-level through the BOM, producing works
orders at all required levels. These are subsequently linked
when shortages at lower levels are released.
- The works order handles
variable quantity items within the BOM. When a variable
item is encountered, the required quantity is requested.
Variables may be used where quantities are unknown until
time of order, e.g. length of cable or where product has
features that can be selected, e.g. with or without CD-Rom
drive.
- After completion,
works orders may be written to history for reporting purposes.
- The works order is
costed at material, labour and overhead. This information
is output to history for analysis.

|

|